Stages of construction from glulam

1 stage
Designing
history-item-img history-item-img history-item-img history-item-img history-item-img history-item-img history-item-img
  1. Preliminary design, project Architectural solutions.
  2. Exterior design is a photorealistic view of your future home.
  3. Planting a house on the general plan of the location.
  4. Selection of equipment together with the customer and preparation of estimates.
  5. The layout design of the Wooden Structure.
  6. Checking the calculation of complex structural elements at the construction institute.
  7. A detailed design of the Reinforced concrete structure or a foundation plan, depending on the need.
  8. Operational design.
  9. If necessary, preparation of design estimates for mortgages and/or building permits.

The task of the design department is to prepare a high-quality package of design works for subsequent construction. The ZAVDOZ design department performs all work at cost (without additional payments and extra charges), so that it is easier for the customer to step over this stage and start the main construction. 

2 stage
Foundation
history-item-img history-item-img history-item-img history-item-img history-item-img history-item-img history-item-img history-item-img history-item-img
  1. Geological studies of the soil.
  2. Geodesy of the location (topography).
  3. Development of a project or revision agreed to the requirements of geology and geodesy.
  4. Linking to the general plan of the location in accordance with the red lines and building standards.
  5. The breakdown of the axes according to the project.
  6. Selection of the most profitable concrete supplier of the required grade for the customer.
  7. A foundation of any type and any complexity.
  8. Verification of hidden works and acceptance by technical supervision.
The foundation is the first stage of any construction work. At this stage, it is important to carry out all the necessary studies of the building location (geology and geodesy) and make sure that the selected type of foundation is correct by preparing a working draft with the calculation of loads. It is equally important to understand the needs and desires of the customer regarding the domestic use of floors (heating systems, finishing) – all this must be taken into account when finalizing the type of foundation. 

ZAVDOZ guarantees the quality of the materials used and the execution of foundation works in accordance with GOST standards and building codes. When carrying out foundation work, technical supervision specialists photograph hidden nodes after pouring concrete.

3 stage
Wall kit
history-item-img history-item-img history-item-img history-item-img history-item-img history-item-img history-item-img history-item-img history-item-img
  1. The basic equipment is Classic 200(w)*185(H) glulam. A large selection of timber sections: from the smallest to the gigantic size.
  2. The choice of timber profile is at the discretion of the customer: German profile, Finnish profile.
  3. Cutting of timber on ultra-precise CNC machines, including complex and oblique elements.
  4. Complete set of the house kit: dry and glued – beams, pillars, rafter system; T-shaped glued casing box and more.
  5. Hardware, spring assemblies and other components in accordance with the project.
  6. Delivery of the house kit in special pints.
  7. Assembling the wall kit in accordance with the standards.
  8. Acceptance by technical supervision.
ZAVDOZ – carries out the installation of glulam structures of any scale and complexity with a warranty of up to 50 years. 

4 stage
Roof
history-item-img history-item-img history-item-img history-item-img history-item-img history-item-img history-item-img history-item-img history-item-img history-item-img history-item-img
  1. The working draft of the roof "Wooden Structures".
  2. The choice of roofing material depends on the architecture of the house (slope angle, number of complex elements, etc.), our architects will help you choose the roof brands that are most suitable for their intended purpose and budget.
  3. Superdiffusion membrane, waterproofing and vapor barrier.
  4. Cross-insulation in accordance with the unique development of ZAVDOZ, provides the greatest thermal protection, especially in the areas of junctions.
  5. The drainage system, roof ventilation, snow retention system are worked out individually for the customer.
  6. Various options for roofing depending on the design and budget: from the frontal board to the metal laminated siding.
  7. Hardware and fasteners of high quality.
  8. Compliance with the installation technology in accordance with proven construction sites based on approved building codes and GOST standards. 
  9. Inspection by technical supervision.

Roof   is not only an exterior solution, it is a set of well-chosen materials and strict compliance with installation standards that ensure high thermal insulation properties. So, for example: The rafter system takes on not only snow loads, but also the weight of the coating itself (especially for natural types of roofing), an important point in installing rafters is the use of sliding fasteners.


5 stage
Windows and doors
history-item-img history-item-img history-item-img history-item-img history-item-img history-item-img history-item-img
  1. The installation of windows and doors is carried out in accordance with GOST, with the mandatory use of casing boxes.
  2. Plastic windows of budget and premium brands – at the customer's choice, from manufacturers.
  3. Luxury wooden Euro windows manufactured by ZAVDOZ.
  4. Panoramic glazing of any complexity.
  5. Portal glazing and HS portals of the entrance type.
  6. Platbands in accordance with the configuration and specific design of the house.
  7. Acceptance by technical supervision.

The ZAVDOZ Group has high competence not only in the installation of translucent structures, but also in design. The company's specialists have been repeatedly involved in writing industry reference books and developing GOST editions.

6 stage
Finishing
history-item-img history-item-img history-item-img history-item-img history-item-img
  1. Designed frame partitions can be executed with finishes of varying complexity. An important condition is compliance with the floating fastening system.
  2. Lining, imitation timber, ceiling board, floorboard, slats and moldings of any configuration - own production. Including a twigless version of the Z-style.
  3. Complex decorative finishing elements: starting from the exterior portals, platbands and column capitals, pumping with raised beams in the interior decoration.
  4. Coloring: a wide range of professional coloring systems. Natural base: water or oil.
  5. Individual stairs made of precious wood according to an individual project.

ZAVDOZ is a major manufacturer of finishing mouldings made of wood. Our range is designed to meet the needs of absolutely any client. Finishing of ceilings, floors, terraces, stairs and fencing, end linings, boxes, bulwarks, imitation timber – this is the minimum set that is needed in almost every home.


7 stage
Construction support
history-item-img
  1. Organization of workers' accommodation: a cabin, a toilet, etc.
  2. Garbage collection in accordance with the law, in order to avoid fines to the customer.
  3. Technical supervision is a service that is mandatory at every ZAVDOZ facility under construction, at every stage of work.
  4. By agreement: Installation supervision is a paid service, the essence of which is training and monitoring of any customer's team, in order to eliminate violations of technology during the installation of ZAVDOZ house kits.
  5. Communications: electrics, low current system, heating, ventilation, water supply and sewerage, air conditioning and much more - from design to installation.
  6. The warranty is up to 50 years.